Ads
-
Related paper
- COMPETITIVENESS ASSESSMENT AND ARCHITECTURAL PROJECTS OF OOO "AM A. BREUSOVA" BASED ON THE CALCULATION OF "RATES OF INDIFFERENCE"
- INTEGRATING PROJECT - BASED MANAGEMENT (PBM) IN ARCHITECTURAL FIRMS FOR INCREASING PROJECTS' DESIGN VALUE
- ANALYSIS OF THE ASSESSMENT OF THE IMPACT OF THE COVID-19 PANDEMICS ON THE DYNAMICS OF NBU DISCOUNT RATES AND INTEREST RATES ON LOANS AND DEPOSITS IN UKRAINE AND THE WORLD
- Еvaluation of the quality of architectural projects
- Application of Basic Design in Architectural Projects
- Features of architectural and planning solutions, calculation and design of hotel complex ?hilton? in batumi
- HYDRODYNAMIC CALCULATION OF OIL PIPELINE AT TRANSPORTATION OIL WITH NON-NEWTONIAN PROPERTIES AT LOW SHEAR RATES
- CALCULATION OF UNDERGROUND SALINE WATER AND DETERMINATION IRRIGATION RATES USING DRAINAGE GUNS
- Decision Support System for Risk Assessment in Construction Projects AHP-Simulation Based Technique
- Assessment of compliance with fire safety requirements of the poultry house for 200,000 heads of “Avangard LLC” in Republic of Mordovia based on fire risk calculation